A flue smokeshaft, 15,000 mm extensive and also 560mm size will be constructed from steel sheet, complete with lagging, damper and likewise water defense cone. The smokeshaft will certainly be lined with castable grade diatomaceous concrete combined with high alumina concrete according to BS 4076: 1989.

The damper will definitely manage the closing of the door to not less than 85%. The heap is to allow fresh air at the supply’s base to make sure that the flue gases are launched at stagnate afterwards 4000 C which the discharge satisfies the British Clean Air Act, the National Setting Management Agency (NEMA) Act or various other significant acts.

1.1.4 POWER SUPPLY

The sub-contractor will certainly supply tools which appropriate for operating a 415V, 3 stage, 50HZ or 240V, solitary phase, 50HZ electric power supply.

1.1.5 OIL STORAGE AND ALSO LIKEWISE SUPPLY

The system will include a mass oil storage tank, daily storage tank, move hand gas pump as well as additionally linked pipe task. Oil from the mass tank will be supplied to a high level daily storage tank located in the heater area by use of a transfer hand pump as well as automated electric pump.

1.1.6 SAVES AND ALSO LIKEWISE GUIDEBOOKS

The tenderer is to submit with his tender a listing of suggested initial supply of spares together with their prices. A part from the heater spares explained right here below, the spares rates are not to be included generally wrap-up of prices routine yet is to be separate and are shown to be ordered later on if as well as also when it ends up being needed as well as practical to the customer. The heating system conserves whose prices are to be contained generally summary of expenses schedule (BQ) are:-

i) 1No. Develop of safety and security controls
ii) 1No. Solenoid valve
iii) 1No. Oil ignition system
iv) 2No. Photo-electric cells

2 collections of operating as well as upkeep handbooks (both for the in addition to heaters) need to furthermore be provided. This include 2 collections of control schematic depictions for all the controls and also circuitry.

1.1.7 MASS OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and additionally complying with BS 799 element 5: 1975 shall be put on 3 concrete cradles.

The works will consist of supply, distribution, putting together, erection, testing, commissioning and preparing to function. The container is to be of bound light steel kind with a format anxiety of 40KN/m2 as well as storage space temperature of 240 C. It is to be located beside the burner as well as central heating boiler home.

The container shall be round with dished end as well as be created of 6mm thick block modest steel plates according to BS 1966. Top premium galvanized materials will not be used.Welded building components shall be sprayed.

E-4

The tank will certainly be pressure examined with a general head of water or matching, evaluated from the base of the container, as well as also equal to 1 1/2 times the amount of:

(i) The elevation of the container and likewise

The stress will be elevated slowly as well as steadily up until the defined examination stress is gotten to which pressure will be maintained for a period adequate time to allow a thorough exam to be made to make certain that the tank is audio enough as well as discloses no leakages or excessive distortion.

The storage container will after that be cleaned on the surface area and also provided with rust preventing guide prior to utilizing 2No.

The storage tank will be supplied with the following:-

(i) 450mm bolted exam covers with liquid and vapour limited joint made with a gasket of gas immune materials.
( ii) 75mm (3″″) vent socket screwed B-SP as well as pipeline at the higher end of the storage tank with an unloading device to avoid the rise in storage space tank stress over the style stress and anxiety. The air vent pipe shall be empty of bends as well as will have a continual rise while being as quick as problem-free.
( iii) 65mm size filling up pipe with tube combining link
( iv) 50mm dimension evaluating connection with lockable cap.
( v) 50mm size supply pipe
( vi) 25mm size water drain-off worth

The tenderer will certainly give hydrostatic oil materials gauge (level indication) or a.
correctly adjusted stick (of dip tape) and get to ladder to the top of the storage tank.

The packing pipe shall be expanded inside the container to within 150mm of storage tank base,.
complete with anti-siphoning device.

The following details shall be entirely and additionally simply marked on the container on the.
centre line near the electrical outlet link.

– – Gross capacity in litres.
– – Test anxiety.
– – Day of examination. – Optimum allowed working stress.
– – Manufacturer’s name of occupation mark.
– – Year of manufacture.
– – The selection of British need as well as likewise type of storage tank

The container will be mounted with a 25mm loss in the direction of the water drain-off touching factor. The supply outlet will be increased inside the container to stay clear of accessibility of water in the supply line. The major service provider will certainly develop container assistances and also bund wall surface areas to information illustrations generated by the sub-contractor. A valued drain off from one of the most cost effective component of the container will be provided complete with tail pipe and likewise a specification for tube pipeline link.

E-5

1.1.8 TRANSFER HAND PUMP

A semi rotating hand pump will be offered filling the day storage tank from the oil drum. It will be set up complete with all the needed pipelines installations and devices.

1.1.9 DAILY SERVICE CONTAINER

A day-to-day storage tank of tiny capability 1,800 Litres will be positioned at 2.5 metre high level in the heater room. Storage tank will be made from 6mm thick pushed steel plates of 1220mm x 1220mm black light steel sheet, complete with bolted cover and likewise adequate venting. The storage tank will certainly satisfy BS 799 part 5 1995 in addition to be offered with a materials watch tube. The container will be lagged with 50mm thick fibre glass insulation of 0.4 W/m2 thermal conductivity as well as also finished with 20SWG galvanized sheets cladding.

The container will certainly be analyzed for any kind of sort of leaks of which if any type of type of is determined will certainly be made great prior to the tank is painted on the surface with corrosion preventing paint. Storage tank to be securely bolted.

1.1.10 AUXILLIARY TOOLS

All pipework made use of in the oil storage space systems will be to B.S. 1387 heavy grade. Joints shall be screwed, and likewise adequate unions should be offered to allow basic removing the equipment.

A 25mm size fire shutoff of the quick activity bar ran dead weight type will be installed, in the oil blood circulation line. This will certainly be kept in the job opportunity by a light scale steel wire linked to a fusible web link. The fusible link will be positioned directly over the heater. The relaxing heater oil feed pipeline from the high degree day container will be warmed by an electrical mapping tape effectively twisted around the pipeline. The pipe shall then be shielded with 25mm thick fiber glass insulation as well as completed with scale 22swg galvanized steel sheet.

The supply pipeline from the mass oil tank to the high degree day has actually been set up by others nonetheless the tenderer shall allow web link to the high level day container. The tenderer will additionally supply and additionally set up high ability filters along the supply pipe as well as the heater feed pipeline.

1.1.11 PIPE SUPPORTS

The array and kind of assistances will be kept to a minimum as well as also their style will be such as to advertise review along with safe managing to match concrete stonework or wood. When developing aids to the upkeep of preferred pipeline loss as well as the restraining of pipeline movements to a longitudinal axial directions only, pendtag

Consideration will be used.

The sub-contractor shall provide as well as set up all steel work creating part of pipeline assistance settings up as well as also will certainly be in charge of making good any kind of kind of problems to service providers function connected with contractors function installment.

Pipe runs will certainly be secured by clips connected to pipeline hangers, wall surface dental braces or trapeze type maintains. ‘‘ U’ screws will certainly not be made use of for clips without previous authorization of the Designer.

The sub-contractor will send his whole proposal for the pipeline supports to the Engineer for authorization before any type of erection job begins.

1.1.12 ELECTRICAL WORKS

All circuitry in between things, plant in addition to controls will be applied by the tenderer. The tenderer shall give enough guidance to make certain that electric links are properly made to all products of tools as well as controls provided by him, all to the Work Manager’s/ Designer’s satisfaction.

E-6

1.1.13 BURNER SCREENING In Addition To COMMISSIONING

The tenderer will certainly check and likewise appoint the burner in the existence of the Engineer.The tenderer will certainly additionally offer adequate oil to last a minimum of 2 (2) hours. The tenderer shall commission the burner as well as test in the existence of the Designer and additionally validate that the burner is working according to the specifications laid here-in as well as in the brochures along with guidebooks from the suppliers of he incinerator.The burner efficiency examination will be performed in conformity to BS3316: component 4:1987. Need to any type of issue be identified, it will certainly be corrected and the testing procedure duplicated to the Job Supervisor’s satisfaction.

1.1.14 FIRE INSTRUCTIONS ALERT

Continue and also acquire as well as likewise place as listed below;

Print fire instructions on the Perspex plate, 3mm close White Colour.
Background determining 510mm lengthx380mm dimension as follow;

1.1.5 OIL STORAGE As Well As ALSO SUPPLY