The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal

reactor (partial load).

 

When switching off, only the solenoid valve for the fuel supply closes, the burner fan stays on to cool and protect the

burner head.

 

The reactor burner shall be modulating burner with pre-ventilation working on the principle of an oil pressure atomizer

with return nozzle for diesel oil, consisting of:

 

–      Fan housing with high-powered fan and cover

 

–      Electric motor

 

–      Oil pressure pump with built-in oil pressure controller

 

–      Burner nozzle rod with return nozzle and baffle plate

 

–      Coupled control with servomotor, rate controller, regulating segment and air valves

 

–          Electromagnetic shut-off dampers

–      Burner tube with flame pot, burner connection and insulation flange

 

–      Electrical high voltage ignition with ignition transformer and ignition electrodes

 

In the control panel:

 

–      Oil firing sequence control automation relay.

capacity – 50 Kg

 

Burn rate – 20 Kg/h

 

maximum Temperature – 1000C

 

Operating Energy – Diesel

 

Ignition method –

 

Combustion chambers – 2

 

Insulation – refractory Lining

 

No of burners – 2

 

Loading Method – Front load with safety latch

 

Chimney – Heavy duty stainless steel

 

Control – Burner control

 

Thermostat control

 

Timer control

 

Fan timer control

 

Instrumentation -4 Digit temperature display

 

Ash removal – Separate ash removal door

 

Fuel consumption per Kg –

 

Automatic & simple to operate control pannel –

 

3 mm steel casing & fully insulation

 

Dense  refractory concrete lining rated to 1400 degree to C

 

safety chute for easy loading –

 

SS Flue as standard –

 

Heat recovery option –

 

Easy onsite Installation –