the three incinerators for burning as well as incineration of medicines as well as harmful compounds

Demands and specs for the process of supply, installation, operation and ensure the three incinerators for burning and incineration of medications and also harmful compounds for customizeds division

Free 3 years warranty for incinerators from shipment day. In addition of complimentary extra components ensure letter ought to be valid for 10 years from the end date of assurance.
Electric device should be delivered with service guidebook in English
Electric capacity need to be 380-220 v 60 Hz for all devices
Provided time asap
Validity of deal ought to be not much less than 6 months
In situation of order, we need two certifications of origin that must be stamped from Saudi consular office in your nation
Business billing (certified from Chamber of Business).
Two initial costs.
Send out a person to fix as well as educate our staff for 5 people in each area.
Send your manuals for installation systems.
Waiting for your excellent reply.
Please offer details for the complying with,.
1-Technical explanation includes technological specifications, scope of job, the needs of the procedure and also upkeep.
2- Technical explanation for service technicians training and heater drivers.
3- Brochures of stove with all the called for specs

The offer cost must include the following;-.
1. Educating for professionals and also drivers for a period not much less than two days at each website and give trainees training certificates.
Files have to include all the info such as pamphlets, technical sources, operating, maintenance guidebooks, as well as pamphlets dealing with the key-board.
2- Letter from the supplier to give three years warranty for incinerators from delivery day. In addition of free spare parts ensure letter should be valid for one decade from the end day of guarantee.
3- Offer certification that the incinerators are environmentally friendly and also attach proof that environmental management companies in the country of Origin and also your product should be discharges cost-free as a result of the level of sensitivity of its global air ports.
4-copmany should committed shipment, procedure, and also setup within 60 days from the date of site jobs detection.
5- Train 5 individuals for two days for each and every device for a duration of two days for installation, operation, and safety. Provide certifications.
GARANTEE.
Supplies operating as well as emergency situation maintenance also provides totally free spare components for 3 from the starting day of the project. The firm needs to make regular upkeep every 3 months as well as raise the upkeep report to the administration of public problem and also Maintenance.
The business must make all the upkeep work also adjustment of the control and defense tools and also filters/ filters detoxify insulation.
Specs of ovens:.
– Mounting a readymade concrete base (Precast) with Elevation 30 cm in the air and also 20 centimeters listed below the surface area of the planet.
– The dimensions of the base are raised by (2 meters) from the side of burners.
– The remainder of the accessories in all the trends even allows the employee directly feeding as well as upkeep job, cleansing and relocate conveniently thinking about the propensities of the base towards the door for water drainage of water.
– The floor finishing should be high-quality epoxy paint.
– Mount anti-rust and warm Umbrella of brick and also steel (pyramid form) of (5) meters elevation above the ground which set up with the edge of the concrete base by thick galvanized columns.
– This umbrella Cover the website heater and also allow bringing the chimney.
– The website is surrounded by an iron fencing (sheet metal) 3 meters elevation from the surface of the planet in order to shield the incinerators from black blizzard.
– The iron fence must have a 5 meters Width entrance.
– Automatic anti-rust as well as heat electrical circuit should be provided.
– The heating systems are very efficient, emissions-free, risk-free, and environmentally friendly as well as have ability of not less than 3,000 kg of materials as well as the price of melting at least 400 kg/ h.
– The approach of feeding the furnace with a side slot or from the leading and also the exhaust of the smoke is entirely stopped.
– a heating system Have to have two spaces, among them is the main space of not much less than the “5” ranges to the process of burning materials and various other secondary area of not much less “2” ovens to shed resulting gas from the first procedure as well as the smokeshaft.
– The primary component of the body of the heating system is stainless steel box, the thickness of not much less than 7 mm with a layer of zinc phosphate layered with aluminium reflector to warm.
– the thickness of the door of 150 mm as well as a hardness of not less than 170 kg/ m 3 to be scorched, automatic detailed remote system.
– Heaters have to be devastating adequate to burn and blaze the material which stated formerly.
– heating systems must have certifications are supported worldwide ventures and government competent for environmental protection In the country of origin or the General Presidency of Meteorology as well as Setting Protection in Saudi Arabia.
– The stove can benefit 24 hr so regarding allow for the burning of materials for a period of not much less than 12 successive hours and the remainder for air conditioning and gives full gas container with a capability of 1000 L to turn on the oven.
– Must have an automatic ignition and diesel is made use of.
– a heating system has the capacity to hold up against severe temperatures as much as “130o c As well as also, it assures constant procedure of which can be used for 1 day with the capacity to get rid of residues throughout the work of the stove, Protecting layer of calcium have to be present in the rooms with Density not much less than 50 mm as well as a wall thickness of 100 mm.
– Isolation of shedding area: the area in between the walls have to be of the “stainless-steel”. Furthermore, shed space has to full of Thermal insulation product.
– Guarantee that the combustion of materials released in the secondary room must be at least two seconds duration as well as the space is lined with high-density ceramic fibbers.
– Incinerators should contain a system for handling (purification) gasses before emission of the smoke.
– Burners have to have the capacity of self-cooling after completion of the daily operating period.
– Incinerators have to have smokeshaft not much less than “4 meters” height from the surface of the oven, additionally, it should be thermally protected and also non-rust able, as well as need to likewise be removable, installment as well as tide default.
– Electrical capacity called for “220/ 380-volt “60 hertz.
– Incinerators have to be fitted with a control board of the digital tricks to monitor all the essential indicators of activation tricks, as well as start-up and switch off so as to be separated inside a steel box with the presence of the following:.
Alarm system Sensor in the event of (accidents “heater” or filtration device or heat leakage or interior connections as well as electrical wiring).
Screens for the temperature level of the rooms.
Aerosols Filter signs/ monitors.
Area temperature level sensors.
Indicators for furnaces as well as index overload.
Timer for Extinguish the stove instantly depending upon the moment called for.
– All devices should be very immune to exterior conditions such as high temperature (50oc).
– All doors have to have unique lock are not allowed non-persons assigned to function.
– Supplying fire extinguisher for each website with an ability of 10 kg at least